DOKAFLEX 1-2-4 PDF

Doka Xtra. Dokaflex Load-bearing towers. – DOKA FORMWORK SYSTEMS. 2. The unbeatably fast table- form with the perfect fit. The manual system with. User information Dokaflex 5. – 07/ Ü. The Formwork Experts. Erecting the formwork. ○ Doka products and systems must be set up in. Download the catalogue and request prices of Dokaflex By doka italia.

Author: Gura Tecage
Country: Saudi Arabia
Language: English (Spanish)
Genre: Finance
Published (Last): 22 October 2018
Pages: 32
PDF File Size: 19.35 Mb
ePub File Size: 2.79 Mb
ISBN: 845-8-17159-350-4
Downloads: 37396
Price: Free* [*Free Regsitration Required]
Uploader: Gataxe

Both for the layout and for spatial representations, Tipos-Doka sets an impressive new standard of visual presentation.

Social The use of social media cookies and applications allows advertising that is suitable for you to be displayed on corresponding platforms. They also help to ensure the safe use of our website. C Doka beam H20 top 2. For further information number of props etc. Other cracking phenomena can be countered effec- tively by appropriate curing methods. The Beam forming support auto- matically clamps the formwork tight, resulting in clean concrete surfaces and grout-tight edges.

Use a suitable lifting chain e. You can import the automatically generated piece-lists into dokaflsx other programs for further processing.

Create new comparison list. Step 2 Floor-slab formwork is lowered using the Doka Xtra head.

Modular formwork / metal / for floors – DOKAFLEX – DOKA FRANCE

The part of this deformation accounted for by creep The basic rule is: This symbol indicates that 1-24- need to be taken by the user. This makes for greater operational reliability, and cuts costs. If the project requires early stripping, the Dokaflex timber-beam formwork system can be equipped with the Doka Xtra head. Palmerston Hospital roof system application.

Related Articles (10)  HP DESKJET 940C MANUAL PDF

A Tr Repositioning by forklift truck or pallet stacking truck A Slide-bolt for fixing the partition The forks can be inserted under either the broadside or the narrowside of the containers.

Hand-Set System | Dokaflex 1-2-4

Indicates that you need to do a sight-check to make sure that necessary actions have -12-4 carried out. Adaptability to all layouts by telescoping the formwork beams downstand beams and floor extensions can doaflex be solved ‘within the system’ perfect adaptability to columns and walls optimising for diff erent slab thickness suitable for shoring fi ligree slabs Safe and fast to set up thanks to pre-defi ned system grid search-times are minimised by dokaflexx only two diff erent lengths of beam the markings on the beams make the system quick to set up and check Durable and practical thanks to its sturdy system components high numbers of re-use cycles and reduced close-out odkaflex, due to the shock absorbers and protectors on the system components site logistics are simplifi ed by the perfectly co-ordinated system components first-rate concrete surfaces, as any type of form-facing can be selected.

The Wheel-around scaffold DF makes for safe, simple formwork set-up and removal in rooms of medium height. When Doka stacking pallets are stacked, the bottom pallet must NOT be one with a bolt-on caster set mounted to it.

This helps us to guarantee the best possible performance of our website, especially. Always apply the fixing brake when the con- tainer is “parked”. Quantities commissioned are reduced because approx.

Spacing of primary beams Slab Spacing of Position 1-2- Beam thickness d secondary beams forming support 20 cm Doka Xtra head If the project requires early stripping, the Dokaflex timber-beam formwork system can be equipped with the Doka Xtra head.

Related Articles (10)  EPSON EH TW3200 MANUAL PDF

The stripping process is very efficient and cost-optimised because it is defined. The Bolt-on caster set B turns the stacking pallet into a fast and manoeuvrable transport trolley. For more information, please see the User Infor- mation booklet “Doka Xtra”. Click here to sign up. Reference Refers to other documents and materials. Required These cookies ensure the basic functions of our website.

Every project is unique. This results in a clean concrete surface. Floor influence zone on either side of the drop-beam max.

In the case of cavity flat-slab floors, significantly lower slab loads occur. OK You can find more information on the use of cookies and opt-out options in our privacy statement.

Using Doka stacking pallets as storage units Max. However, the specific applications shown here, using the Beam forming support, are permitted.

Description Supplier Specifications The quantities are computed very simply, using the slide-rule, with no need for formwork planning. The increase in the elastic deformation taking place in In the case of thin, wide-spanned concrete floor-slabs the new concrete is thus only negligible.

The Doka tables are pre-assembled, and save on both labour and crane time. This does away with time-consuming jobsite squared- timber constructions.

Tie-back attached to a diam.